top of page
36mtr Steel Bridge Fabrication & Erection
SAS Construction executed the fabrication and erection of a 36-meter steel bridge with a strong focus on structural integrity, quality workmanship, and execution safety.
The project involved precision fabrication of steel components followed by systematic site erection as per approved drawings and engineering specifications.
Careful attention was given to alignment, welding quality, and load transfer during installation to ensure long-term performance.
All activities were carried out following established quality control procedures and safety guidelines.
The bridge was delivered as a reliable infrastructure asset meeting project and operational requirements.
bottom of page


