48mtr Steel Bridge Fabrication & Erection

SAS Construction executed the fabrication and erection of a 48-meter steel bridge with a focus on structural accuracy, quality workmanship, and safe execution.
The project involved controlled fabrication of steel components followed by planned transportation and systematic site erection.
Careful attention was given to alignment, welding quality, and load distribution during installation.
All works were carried out as per approved drawings, engineering specifications, and safety guidelines.
The bridge was delivered to meet durability, performance, and operational requirements.