top of page

60mtr Steel Arch Bridge Fabrication & Erection 

SAS Construction executed the fabrication and erection of a 60-meter steel bridge, demonstrating capability in handling large-span bridge structures with precision and control.
The project involved fabrication of major structural steel components followed by systematic transportation and site erection.
Special care was taken to maintain alignment accuracy, welding quality, and structural stability during erection.
All works were carried out in accordance with approved drawings, engineering specifications, and safety procedures.
The bridge was delivered with a focus on durability, load performance, and long-term service reliability.

© 2026 SAS Construction. All Rights Reserved.

GSTIN: 05AQUPA1548D1Z3

bottom of page